Mining & Aggregates

PRIMARY CRUSHER RELOCATION

Round Mountain, Nevada

view details

This project consisted of a new truck dump facility and relocation of the primary crusher, apron feeder and control tower weighing over 150,000 tons. The scope of work included the construction of a 58 foot high cast-in-place concrete retaining wall system, a massive dump pocket, crusher foundations, over 1,000 linear feet of overland conveyor, and all associated electrical, mechanical and piping. All work was completed on schedule while the mine remained in operation.

Start Date: September 2008
Completion Date: January 2009
Contact: Vince Lofftus
Engineer: Hanlon & Associates, Inc.

CORTEZ HILLS MECHANICAL

Crescent Valley, Nevada

view details

The project consisted of construction services for the piping and mechanical work. The project has 3 locations each about 3 miles apart on the property. The work involved installing a new gyratory crusher and its associated support equipment and piping. It also included the piping, mechanical and equipment work at the new truck shop (for 400 Ton haul trucks), truck wash facility, and lube room. This work also incorporated the piping and mechanical for the CIL tanks in the process building and the pregnant and barren systems.

Start Date: May 2009
Completion Date: February 2010
Contact: Barrick Gold
Engineer: SNC - Lavalin America

YANKEE GULCH SODIUM MINERALS PROJECT

Parachute, Colorado

view details

The Yankee Gulch project involved the supply and installation of 9,000 cubic yards of concrete for the complete construction of the product storage silos, tunnels, loadout facilities, and the process building.

Start Date: May 1999
Completion Date: May 2000
Contact: Kvaerner Metals
Engineer: Kvaerner Metals

ANDALEX/LADWP WILDCAT LOADOUT REVISIONS

Price, Utah

view details

This project consisted of the installation of a new truck dump, a new CMP tunnel and conveyors, a new radial stacker and new reclaim conveyors.

Start Date: November 1994
Completion Date: February 1995
Contact: Andalex Resources, Inc.
Engineer: Norwest Mine Services, Inc.

BRIDGER COAL UNDERGROUND OVERLAND CONVEYORS 1, 2 & 3

Point of Rocks, Wyoming

view details

This Design/Build project consisted of the complete design, supply and installation of approximately 15,000 lineal feet of 48" overland conveyance, dustless transfers, truck dump and stacking systems, including civil and structural placement.

Start Date: March 2005
Completion Date: January 2006
Contact: Bridger Coal Company
Engineer: Smith, Monroe & Gray

CORTEZ PIPELINE

Beowawe, Nevada

view details

The Cortez Pipeline construction project included the installation, commissioning and start-up of a 3,000 TPD gold recovery plant. The facilities include grinding, flotation, refining, tailings circuits, ball and sag mill, process piping and conveying. Construction also included approximately 1,000 tons of structural steel, four elevated pre-engineering MCC electrical rooms, 300 HP agitators and process screen.

Start Date: 1997
Completion Date: 1997
Contact: Cortez Joint Venture
Engineer: Placer Dome Technical Services

DUGOUT CANYON MINE SURFACE FACILITY

Wellington, Utah

view details

The Dugout Canyon Mine Surface Facility included all civil, structural, mechanical and electrical work. The installation of foundations, 1,500 tons of structural steel, five material conveyors, crushing and truck loadout facilities were included in this project. Mining activities continued throughout the construction of the facility.

Start Date: November 1998
Completion Date: July 1999
Contact: Canyon Fuel Company
Engineer: Centry Contractors & Engineers

OCI WYOMING UNIT 6 PROJECT

Green River, Wyoming

view details

Construction of the OCI Wyoming Unit 6 Project consisted of a soda ash facility, including the installation of all civil construction, underground utility piping, and approximately 14,000 cubic yards of concrete.

Start Date: June 1997
Completion Date: September 1998
Contact: OCI Wyoming, LP
Engineer: Kvaerner Metals

CLINKER STORAGE AND HANDLING FACILITY

Apple Valley, California

view details

This project consisted of construction of the Clinker Storage Building foundation which included site grading, backfill, reinforcing steel and embeds. Project also required dismantling, relocation and placement of the Kiln shell to be used as a conveyor tunnel.

Start Date: July 2004
Completion Date: February 2005
Contact: CEMEX California Cement
Engineer: M3 Engineering