Currently, the existing treatment plant takes in 1.784 million gallons daily and produces 1.7 million gallons of drinking water. With the new facility the county will be able to take on an additional 1.416 million gallons per day. Total daily output of the new treatment plant would be approximately 3.2 million gallons per day of treated water for the Island of Maui.

Scope of work consists of a treatment plant building; an above-ground, 2,000-gallon diesel fuel tank as part of a generator system; a sludge lagoon; a chlorine contact tank; finish waterline; gravity wastewater line; and a drainage system.