Client
US Robotics
Engineer
MHTN
US Robotics Workspace Bodell Construction

The project involved construction of a microchip component manufacturing facility with computer controlled process lines and an electronics clean room assembly area. This project was a Cost-Plus Design/Build contract that grew in scope as the plans were completed. Operation of the plant continued on a 24-hour basis during construction.