PacifiCorp
Engineer
Resources Conservation Company
Tower Lifted by Cranes

This project included the removal of the existing 60,000 lb. concentrator and generator and replacing it with a new 70,000 lb. concentrator, generator and all related equipment.

The replacement included:

  • Compressor
  • Heat Exchanger
  • Chemical Inductor Pumps
  • Fabrication and Installation of all Stainless Steel Piping and Bolt Ups
  • Alignment of Pumps and Tanks
  • Extended Structure of the Stair Tower
  • Modification of Roofing and Platforms to accommodate the new equipment
  • Instrumentation