Industries
Power Generation
Services
Preconstruction
Client
Institutional
Engineer
RMH Group
Architect
FFKR Architects

The Central Utility Plant Cogeneration project consists of the modernization of the existing  Central Heating Plant from coal fired boilers to natural gas cogeneration.

This project includes: A building addition to house a turbine Solar Titan 130 and new mechanical and electrical equipment. In addition, modifications have been made to the existing structure in order to house the Heat Return Unit and a new control room. The scope also includes additions to the campus electrical distribution system and the north, south and west substations. The new facility provides heating and cooling capabilities for the campus offsetting 30 to 50 percent of campus’s current electrical needs, all without burning coal.

This project has been recognized as one of Most Outstanding Projects of 2019 voted by Utah Construction and Design. https://utahcdmag.com/2020/01/central-utility-plant-facility-cogeneration-upgrade-2019-most-outstanding-utilityinfrastructure-project/

Related Projects

BYU Cogeneration Plant - Commercial contracting by Bodell Construction

Co-Generation Facility Phase 2 and 3

Power Generation

Transporting Pipes for Materials

Puna Geothermal Mechanical Expansion

Power Generation

External staircase of Bodell design/build contracting project

Biomass Power Plant

Power Generation